| Fillets:
Similarly at all the junctions
of the parapet wall and
the slab, the fillets
must be built up with
a mix of cement/sand/quartz
sand mix with Koster SB Bonding
emulsion and water at
least 24 hours prior to
the application.
Down take / Pipe
Insertions:
Pipe inserts must be installed
prior to the application
of the Koster NB\Koster NB Elastic
waterproofing system.
At the opening in the
slab around the pipe the
substrate should be similarly
opened up by cutting back
around the pipes to give
sufficient depth and cleaned
thoroughly. This must
be then built up with
a mix of cement/sand mix
with Koster SB Bonding emulsion
and water at least 24
hours prior to application.
Construction
Joints:
Finally dampen all the
surface areas thoroughly
with clean water using
high pressure water jet
apparatus, as this is
necessary prior to the
application of the Koster
NB system. The dampness
in the substrate will
ensure that the chemical
reaction between the Koster
NB system and the chemicals
in the concrete substrate
takes place completely.
However the application
of the Koster NB system should
not be made over standing
or running water.
MIXING AND APPLICATION
| Mixing:
To one bag of Koster
NB I (25 kgs), add
7 - 8 liters of
water premixed with
10 % SB Bonding
Emulsion. Mix thoroughly
to a slurry consistency.
The system is now
ready for application.
The two components
of the Koster NB Elastic
system must be mixed
together. Mix thoroughly
to a slurry consistency.
The system is now
ready for application. |
|
Materials:
Koster NB cement based
crystalline waterproofing
system
Koster NB Elastic cement
based crystalline
waterproofing system
Koster SB Bonding Emulsion
liquid
Water
Brushes |
Application:
The Koster NB system is brush
applied, on to the already
damped surface. The brush
on is done in 3 coats.
The coverage is 0.65 kg
per sq. meter per coat
and each coat is done
perpendicular to each
other. After the 1st coat
there should be a gap
of 12 – 24 hours
before the 2nd coat is
applied. Prior to the
2nd coat application the
1st coat surface should
be dampened to ensure
that the chemical reaction
is complete on the underside.
No water curing is required.
Similar procedure must
be followed for the 3rd
coat. The finished surface
should be left exposed
for 48 hours.
For all the pipe insertions,
cold joints, construction
joints, separation joints
masonry joints areas the
Koster NB Elastic system should
be applied to make it
completely watertight
as 4th coat. The Koster NB
elastic properties of
the system will eliminate
the possibilities of cracks
developing at these junctions.
For the expansion joints
care must be taken to
complete the application
of the Koster NB system right
into in insides of the
expansion joint first.
Once this is complete
and cured then a backing
of thermocole is provided
as a filler material and
the final 25-mm must be
filled with Polyurethane
sealant. This will help
to take care of the high
expansion/contractions
of the substrate at these
points. This treatment
is carried out at additional
cost.
All vertical and horizontal
watas must be built up
and then treated with
the Koster NB and then the
Koster NB elastic system as
given above.
LIMITATION:
The Koster NB system
cannot be applied on running
or standing water.
The Koster NB system must
be protected from acid
or sulphurous attack in
concentrations exceeding
that in Portland Cement
Type I / II
The Koster NB system once
installed must be protected
from damage by other agencies
working in the installed
area. Further if applied
on the positive side protection
must be provided against
mechanical damage. |